Building the Tower

Lift off for The Emporium
After initial piling works through the foundations of the original buildings, the 15 storey concrete frame tower was built by specialist Clark Mulherne, topping put in November 2017, reading for curtain walling and cladding. The Emporium tower doesn’t quite touch the listed buildings at any point.

Pin It on Pinterest

Share This